Coffee Ride (construction route)
2023
Sep
24
10:00 am
Status
DONE
Mileage
Mileage
32.8
Elevation
Elevation
982
Pace
Pace
Terrain
Terrain
Description
Mostly flat ride with a false flat on 14400 S. plus Temple hill on 4000 W. There are several ways to make this ride shorter ( 22 and a 26) or if your not up to 32. Regroup at 11800 at the Maverick. Some riders may enjoy a hot or cold beverage after ride at High Point Coffee.
Meeting Location
1735 W 7800 S. Park in the Northeast part of the parking area (Vasa)
No bathrooms available at start
Ride Leader